Safeguard
Compliance•

How do you label shipped, early, and planned items on a security page?

Use three labels with fixed meanings, dates, and an owner so a security page never shows a plan as a shipped control. Includes a table and sample wording.

Safeguard Security Team
4 min read

Use three fixed labels on a security page: available (in production and evidenced), early access (limited availability, stated limits), and planned (not built, with a date range only if you will keep it). Define each label once on the page, date every entry, and never place a planned item in the same list as shipped ones.

Why labels matter

Security pages tend to blend what exists with what is intended. A reviewer reading "we support X" assumes today. If X is a roadmap item, the page has made a claim the product cannot meet, and a customer who relied on it may feel misled. Labels remove the ambiguity without removing the ambition.

The three labels

LabelMeaningEvidence expected
AvailableIn production for customers, works as describedDocumentation, test or log evidence
Early accessOffered to some customers, limits knownDocumented limits and who can join
PlannedNot yet built or releasedA dated plan, owner, and no promise of an outcome

Print this table on the page, or link to it, so readers know what each label means.

Wording that works

  • Available: "Single sign-on is available for all plans. See setup guide."
  • Early access: "Feature X is in early access for selected customers. It does not yet support Y. Ask us to join."
  • Planned: "We plan to add Z in the first half of next year. Plans can change, and we will update this page when they do."

Keep planned items short, and avoid tense that sounds like completion. Words like "will soon," "fully supports," and "coming" with no date invite disappointment.

What to keep out

Do not list a planned control inside a table of controls with a tick mark. Do not describe an audit that is underway as if it were finished. A SOC 2 report is issued by an independent CPA firm, and AICPA describes the SOC suite as assurance reports CPAs may provide. If yours is not issued, say it is in progress, or leave it out.

Keep labels honest over time

  1. Add an owner for each labeled item.
  2. Review all labels with each release.
  3. When early access becomes available, change the label and date together.
  4. When a plan slips, update it publicly rather than waiting for someone to notice.
  5. When a planned item is dropped, remove it.

A small dated changelog at the bottom of the page lets repeat visitors see what moved.

Align everything else

The labels should match your docs, your sales deck, and your questionnaire answers. If the page says early access and a slide says available, a buyer will find the mismatch. A shared claims record makes this easy to check. See the related post on who should own the trust page.

Where Safeguard fits

Safeguard labels its own capabilities by maturity in internal references and keeps public statements to those that are generally available. Its compliance and evidence automation helps teams keep evidence for claims. Try a free scan at gold.safeguard.sh/scan.

Quick check

Is it bad to show a roadmap on a security page?

No, if it is clearly labeled as planned, dated, and kept separate from shipped items.

Should I give target dates for planned items?

Only if you will keep them current. A stale date is worse than a general window or no date.

Sources

Last reviewed: 19 October 2026.

Never miss an update

Weekly insights on software supply chain security, delivered to your inbox.

Self-healing security runs on Safeguard.

Your first fix PR is minutes away.

No sales call required, even your agent can complete the purchase over MCP.