Safeguard
Security Guides•

Chaos engineering vs load testing vs fault injection

Chaos engineering, load testing and fault injection are related but not the same. What each one answers, when to use it, and how they fit together.

Safeguard Security Team
3 min read

Load testing asks how the system behaves under volume. Fault injection is a technique that introduces a specific failure. Chaos engineering is the practice of using experiments, often with fault injection, to test a hypothesis about steady state. They overlap, and a mature team uses all three.

Load testing

You send controlled traffic at a system and measure throughput, latency and errors as volume rises. It answers how much can we take, and where does it break. The Google SRE book recommends finding each component's breaking point and checking that it sheds load rather than crashing, and testing both sudden and gradual increases.

Load testing does not, by itself, tell you what happens when a dependency vanishes.

Fault injection

You deliberately introduce a fault: kill a process, add latency, drop packets, return errors, expire a certificate, deny a permission. It is a technique, and it can be used in a unit test, an integration test or a full experiment. It answers: does the code handle this specific failure.

Chaos engineering

The Principles of Chaos Engineering describe a discipline built around a hypothesis about steady state, varying real-world events, minimising blast radius, and ideally running in production and automating. The site is clear that the goal is to confirm the system works, by trying to disprove that steady state holds. Fault injection is how the event is introduced. The experiment design around it is what makes it chaos engineering.

Side by side

Load testFault injectionChaos experiment
Main questionHow much can it take?Is this failure handled?Does steady state hold when reality intrudes?
InputVolumeOne specific faultRealistic faults, varied
Needs a hypothesisSometimesNot alwaysYes
Typical settingPre-productionTest or stagingStaging, then production
OutputCapacity and limitsPass or fail on a caseConfirmed or refuted hypothesis

Which for which question

  • Can we survive launch day? Load test.
  • Does the retry code actually back off? Fault injection, see retry storms.
  • Does login hold when the identity provider is slow, with real traffic? Chaos experiment.
  • Do we shed load before collapsing? Load test with a dependency fault, which blends both. See load shedding vs rate limiting.

Where security comes in

All three can test security behaviour. A load test can show whether a rate limit holds. Fault injection can check that an authorisation error denies access. A chaos experiment can test whether a control keeps enforcing when its backing service is down. For the security flavour, start with steady state metrics for security chaos experiments and dispel common doubts in chaos engineering myths versus facts.

Quick check

Is a game day the same as chaos engineering?

Not quite. A game day is a planned exercise, often a tabletop or a manual fault, and it can feed chaos work. See the game day plan.

Do I need special tools?

No. A script that blocks a port or adds latency in staging is enough to start.

Sources

Last reviewed: 19 October 2026.

Never miss an update

Weekly insights on software supply chain security, delivered to your inbox.

Self-healing security runs on Safeguard.

Your first fix PR is minutes away.

No sales call required, even your agent can complete the purchase over MCP.